Mobilinx – Hazel McCallion LRT – (19) Hazel McCallion Line takes shape |LinkedIn
We are proud to contribute to the development of the 18-kilometre Hazel McCallion Line transit system, which will feature 19 stops, pass through two urban growth centres, and connect to six major transit systems, including GO Transit (Milton and Lakeshore West lines), the Mississauga Transitway, Brampton Transit, ZUM, and MiWay. As Mississauga and Brampton continue to grow with new residents, businesses, and amenities, the need for sustainable and reliable transit has never been more critical. Metro Infrastructure is committed to delivering quality results and playing a vital role in this transformative project.
Since starting civil construction in the spring of 2022, our team has worked tirelessly to complete key milestones, including rebuilding four manholes and relocating telecommunications infrastructure across six major players—Bell, Rogers, PSN, Telus, Zayo, and Beanfield. Our scope of work spans civil construction, aerial work, cabling, fusing, and fibre cutovers, ensuring every detail is handled with precision and care.
Our commitment to excellence extends beyond construction. Our team is on call 24/7 to respond to any PSN outages along the LRT corridor, providing quick, reliable solutions when needed. Additionally, our hydrovac services have been leveraged by Mobilinx to support other clients, further showcasing our dedication to teamwork and quality in every aspect of the project.
We take pride in contributing to such an important initiative and look forward to continuing our work as the Hazel McCallion Line project moves toward completion.
